We are shutting down for two weeks over Christmas from 23rd  December and returning on the 6th  January.

Any applications received from the 9th December may not receive a letter (estimate) or quote until after we have returned.

 

Change Existing Connection

 

Use this form when you want to increase load / capacity of your existing connection OR remove, replace / repair an existing asset.

An application fee of $100 is required before your application is processed. You can pay the application fee at any of our offices, or by online banking into account number 02-0332-0011638-00 using your name as the payment reference. We do not accept credit card payments.

You will receive a quote within 10 days.

 

Applicant Details

Site Details

Electrical Contractor

Connection Details

Please identify:
– the location of your property
– any existing electricity supply
– where electricity supply is required
– property boundaries
– nearby road names
– direction of nearest township
– any other useful landmarks

Click here to read the terms.
reCAPTCHA is required.

If you prefer, you can Download a printable application form and bring the completed form into our office, or send it to us by email at ciw@topenergy.co.nz